Current Measure I Projects at Alameda High School

Current Measure I Projects

Modernize and seismically retrofit Historic Alameda High School.

Reconstruct all structural and most non-structural elements in the Central Building and Science Building while retaining existing exterior shells. Keep exterior "as-is" as much as possible, with restoration and access alterations only as required.

 

 

 

 

 

 

 

HAHS building design
Exterior of the HAHS Central Building from the Schematic Design document

 

floor plan of HAHS central building, first floor


Floor Plan of HAHS Central Building, First Floor

 

Artis rendering of the front of science building
Artist's rendering of front of Science Building

 

front of central building
Artist's rendering of front of Central Building

 


 

grouting truck
Grouting Truck, June 5, 2017

grouting the foundations for the seismic upgrade

Grouting the foundations for the seismic upgrade

   
HAHs during preparation for seismic mitigation 1 HAHs during preparation for seismic mitigation 2
HAHS during preparation for seismic mitigation 3 HAHS during preparation for seismic mitigation 4
Photos of HAHS interior during preparation for seismic mitigation, May 11, 2017

 

Planned Measure I Projects at Alameda High School

(As approved by the Board of Education)

  • School is being restored for student use
  • Structural seismic rehabilitation of all HAHS buildings
  • Comprehensive restoration of HAHS and Technical Arts buildings
  • Fully modernized science classrooms in HAHS East Wing
  • Renovate HAHS Central Avenue facade
  • Remove debris fence from HAHS buildings
  • Technology, communication, and safety/security improvements
  • Critical mechanical, electrical, roofing, and accessibility improvements